NEW QUESTION # 40
Which order type is used for repetitive manufacturing?
- A. Kanban order
- B. Process order
- C. Planned order
- D. Production order
Answer: C
NEW QUESTION # 41
In the bucket planning mode of the capacity scheduling table, what happens if the sum of the requirements of all operations exceeds the available capacity of the bucket?
- A. The operation CANNOT be dispatched.
- B. The operation is rescheduled to an alternative work center.
- C. The operation is rescheduled in the planning direction.
- D. The operation is rescheduled backwards.
Answer: C
NEW QUESTION # 42
For a production version to be valid and consistent, what requirements must be fulfilled? Note: There are 3 correct answers to this question.
- A. The lot size range must be within the lot size range of the assigned routing.
- B. The assigned routing and bill of material (BOM) must be valid in the entire validity period.
- C. The deletion flag must NOT be set for the bill of material (BOM) or the routing.
- D. The assigned routing and bill of material (BOM) must have the same validity period.
- E. The consistency check must be performed.
Answer: A,B,E
NEW QUESTION # 43
What does forecasting in the demand planning cycle include?
Note: There are 3 correct answers to this question.
- A. Past quotation quantities
- B. One-off events
- C. Past sales order quantities
- D. Market intelligence
- E. Past production planning quantities
Answer: B,C,D
NEW QUESTION # 44
When can you maintain the batch characteristic values in SAP S/4HANA?
Note: There are 2 correct answers to this question.
- A. When you release the batch
- B. When you execute batch determination
- C. When you post the goods receipt
- D. When you record inspection results
Answer: C,D
NEW QUESTION # 45
Under what circumstances can you change the material type for a material if stocks, reservations, or purchasing documents exist? Note: There are 2 correct answers to this question.
- A. The quantity and value updates are the same.
- B. The same account category is used.
- C. The same base unit of measure is used.
- D. The same batch management level is used.
Answer: A,C
NEW QUESTION # 46
Which of the following are replenishment strategies for Kanban containers?
Note: There are 2 correct answers to this question.
- A. Replenishment using process orders
- B. Replenishment using direct transfer posting
- C. Replenishment using planned independent requirements
- D. Replenishment using reservations
Answer: B,D
NEW QUESTION # 47
What are some benefits of planning with planned independent requirements for finished materials?
Note: There are 2 correct answers to this question.
- A. The delivery time is reduced.
- B. You have the option to use make-to-order production.
- C. You have the option to use forecast planning.
- D. Manufacturing time for final assembly is reduced.
Answer: B,C
NEW QUESTION # 48
What are the selection criteria of a bill of material (BOM) alternative?
Note: There are 2 correct answers to this question.
- A. Date
- B. Lot size
- C. Change number
- D. Material BOM usage
Answer: A,B
NEW QUESTION # 49
Which time elements does MRP consider in backward scheduling to determine the basic dates for components from dependent requirements? Note: There are 2 correct answers to this question.
- A. Planned delivery time
- B. Total replenishment lead time
- C. In-house production time
- D. Operation duration
Answer: A,C
NEW QUESTION # 50
What determines whether the planned independent requirements in demand management are consumed by other requirements? Note: There are 2 correct answers to this question.
- A. Order type
- B. Requirements profile
- C. Planning strategy
- D. Requirements type
Answer: C,D
NEW QUESTION # 51
How can you achieve a feasible production plan when there are capacity constraints?
Note: There are 3 correct answers to this question.
- A. Form optimum sequences to reduce setup times
- B. Execute an infinite production planning run for the critical resources
- C. Increase the capacity supply in a time-phased interval
- D. Determine a time period with available capacity on the planning board
- E. Reduce the planning time interval
Answer: A,C,D
NEW QUESTION # 52
When does the system trigger replenishment for a Kanban container?
- A. When you set the container to In transit
- B. When you set the container to Empty
- C. When you set the container to Full
- D. When you set the container to Waiting
Answer: B
NEW QUESTION # 53
When do you use variant bills of material (BOMs)?
- A. When multiple materials have similar BOMS
- B. When multiple materials have multiple BOMS
- C. When a material has multiple BOMs
- D. When a material has a configurable BOM
Answer: A
NEW QUESTION # 54
Which chart types does the tabular planning table for capacity planning provide in SAP S/4HANA Cloud Private Edition?
Note: There are 2 correct answers to this question.
- A. Order (pool) chart
- B. Order (dispatched) chart
- C. Work center capacities chart
- D. Capacity requirements chart
Answer: C,D
NEW QUESTION # 55
Which time elements are relevant for lead time scheduling of a production order?
Note: There are 2 correct answers to this question.
- A. Setup time
- B. Opening period
- C. Total replenishment lead time
- D. Float after production
Answer: A,D
NEW QUESTION # 56
You are a consultant on an SAP S/4HANA Cloud brownfield project. In a meeting the customer decides to remodel an existing business process in accordance with clean core principles.
Which of the following SAP Signavio solutions can be used for the remodeling?
- A. SAP Signavio Process Insights
- B. SAP Signavio Process Governance
- C. SAP Signavio Process Manager
- D. SAP Signavio Process Intelligence
Answer: C
NEW QUESTION # 57
Which of the following questions do you have to answer before you start creating a bill of material (BOM)? Note: There are 2 correct answers to this question.
- A. When does the BOM need to become effective?
- B. For which plant can the BOM be defined?
- C. In which storage location is the BOM required?
- D. Which base unit of measure must the BOM have?
Answer: A,B
NEW QUESTION # 58
Which of the following are scheduling time elements for a production order?
Note: There are 3 correct answers to this question.
- A. Setup time
- B. Queue time
- C. Transit time
- D. Load time
- E. Float before production
Answer: A,B,E
NEW QUESTION # 59
Your production planners are supposed to execute planning only for specific resources. What do you use to achieve this in Advanced Planning (PP/DS)?
- A. A planning area
- B. A propagation range
- C. A planning group
- D. A work center hierarchy
Answer: C
NEW QUESTION # 60
What is a work center hierarchy?
- A. A group of alternative work centers providing a cumulative available capacity for production
- B. A group of work centers in a production line that is used in sequence for production
- C. A group of alternative work centers for production, structured in hierarchy levels by priorities
- D. A group of work centers in a parallel sequence that is used to split production quantities and work on them in parallel
Answer: A
NEW QUESTION # 61
......