NEW QUESTION # 13
What are the benefits of using the benchmarking option of the DMO for SUM? Note: There are 2 correct answers to this question.

  • A. You can verify that the content of the download directory matches the stack XMML file.
  • B. You can obtain migration duration files from a previous benchmark run that can be used to optimize the next runs.
  • C. You can record the modification adjustment during migration and use the transports in the next runs.
  • D. You can find the optimal number of parallel R3load processes by monitoring host performance.

Answer: B,D


NEW QUESTION # 14
You have selected "Standard" as scenario strategy in the SUM tool.
Which steps take place via the shadow instance? Note: There are 2 correct answers to this question.

  • A. Modification adjustment (SPDD)
  • B. Modification adjustment (SPAU)
  • C. Activation of dictionary objects (ACT_UPG)
  • D. Conversion of application tables (PARCONV_UPG)

Answer: A,C


NEW QUESTION # 15
Which steps should be performed during the adjustment of dictionary objects (SPDD) in the development system before SUM continues? Note: There are 2 correct answers to this question.

  • A. Assign the transport request as a modification adjustment transport.
  • B. Release the transport request containing the modification adjustment.
  • C. Manually activate the adjusted dictionary objects.
  • D. Create new versions of the objects you need to adjust.

Answer: A,D


NEW QUESTION # 16
You are performing an SAP S/4HANA conversion for your production system. This conversion project requires that certain business functions are switched on. Following SAP recommendations, how will you achieve this? Note: There are 2 correct answers to this question.

  • A. Activate the required business functions in the switch framework from section S/4H_ALWAYS_ON_FUNCTIONS.
  • B. Import a transport request from the development system that contains the recording of the activation.
  • C. Activate the required business functions manually in the production system.
  • D. During conversion, SUM delivers some business functions already activated.

Answer: B,D


NEW QUESTION # 17
Which step can be optimized when you provide the MIGRATE_DT_DURXML file to SUMM?

  • A. Downtime migration
  • B. Shadow on target creation
  • C. Silent data migration (SDM)
  • D. Downtime conversion

Answer: A


NEW QUESTION # 18
You are performing an SAP S/4HANA conversion with scenario strategy Standard. Which phases are executed during SUM technical downtime? Note: There are 2 correct answers to this question.

  • A. TABIM_SHADOW_INC
  • B. PARDIST_SHD
  • C. PARMVNT_UPG
  • D. TABIM UPG

Answer: C,D


NEW QUESTION # 19
What is the name of the additional server that is used for a transition to SAP S/4HANA Cloud Private Edition?

  • A. Transition Server
  • B. Migration Server
  • C. Migration Hub
  • D. Central Instance

Answer: B


NEW QUESTION # 20
You are performing an SAP S/4HANA conversion.
When does the silent data migration (SDM) take place using the SUM defaults?

  • A. During the Preprocessing roadmap step
  • B. After SUM has ended
  • C. During the Post processing roadmap step
  • D. Before the start of the SUM technical downtime

Answer: B


NEW QUESTION # 21
You are performing an SAP S/4HANA conversion with the migration repetition option. After which phase does SUM stop to enable a test cycle?

  • A. EU_CLONE MIG SOT RUN
  • B. EU CLONE MIG_DT_RUN
  • C. EU_CLONE MIG_DT_CREATTE
  • D. EU IMPORT ALL

Answer: B


NEW QUESTION # 22
Which of the following are valid options to check the progress of an in place SUM DMO run? Note:
There are 2 correct answers to this question.

  • A. Check the Charts Control Center in the SUM UL
  • B. Check the dump size of the database export in the SUM directory, subdirectory a bap, subdirectory load.
  • C. Check the log files written in the SUM directory, subdirectory a bap, subdirectory log
  • D. Check logs for jobs starting with RSUPG SGEN in the SAP system.

Answer: A,C


NEW QUESTION # 23
When using the DMO of SUM, which files can be handled by SUM in the download directory? Note:
There are 2 correct answers to this question.

  • A. Breakpoint configuration file SAPUPPHAS.BRK
  • B. MIGRATE_DT_DUR.XML file from a previous run
  • C. Stack XML file calculated by the maintenance planner
  • D. Parameter file SAPup_add.par

Answer: B,C


NEW QUESTION # 24
You are performing an SAP S/4HANA conversion. You are in the BIND PATCH phase of the Configuration roadmap step. For some software components, you find entries in the Calculated level column.
What does the Calculated level indicate for those software components?

  • A. The SAP Support Packages in the download directory that are newer than the selected Support Package stack
  • B. The SAP Support Packages contained in the upgrade media, calculated by the maintenance planner
  • C. The SAP Support Packages of the Support Package stack, calculated by the maintenance planner
  • D. The SAP Support Packages that will be bound to the conversion

Answer: A


NEW QUESTION # 25
What is the main purpose of performing benchmark runs for an SAP S/4HANA conversion?

  • A. To optimize the activation
  • B. To optimize the main import
  • C. To optimize the conversion
  • D. To optimize the migration

Answer: D


NEW QUESTION # 26
You are planning an SAP S/4HANA conversion.
Which conversion-specific tasks must be performed during the preparation phase?

  • A. Run the database migration to the SAP HANA database.
  • B. Check the compatibility of custom code with SAP S/4HANA.
  • C. Solve problems from the simplification item (SI) checks.
  • D. Perform the migration of data to the new data structure.

Answer: B


NEW QUESTION # 27
You are performing an SAP S/4HANA conversion, scenario strategy Standard, with DMOO as an in place migration. How does SUM transfer the data from the source database to the target database during the migration?

  • A. Using R3load and network socket connection
  • B. Using work processes and network socket connection
  • C. Using R3load and file transfer
  • D. Using R3load and memory pipes

Answer: D


NEW QUESTION # 28
You are running an SAP ECC system with SAP BASIS 740, non-Unicode on SAP MaxDB. Which of the following are possible paths to perform an SAP S/4HANA conversion? Note: There are 3 correct answers to this question.

  • A.
  • B.
  • C.
  • D.
  • E.

Answer: A,C,E


NEW QUESTION # 29
......


SAP E-S4CON-2505 Exam Syllabus Topics:

TopicDetails
Topic 1
  • Manual interventions during a system conversion: This section of the exam measures the skills of SAP System Administrators and covers the manual steps required during a system conversion. It includes tasks that cannot be automated and require technical oversight, ensuring that system stability and data integrity are maintained throughout the process.
Topic 2
  • Downtime optimization and execution: This section of the exam measures the skills of Technical Consultants and covers methods to optimize downtime during a system conversion. It emphasizes strategies to reduce business disruption, ensure smooth execution, and apply best practices for time-efficient conversion activities.
Topic 3
  • Activities before starting a system conversion: This section of the exam measures the skills of SAP System Administrators and covers the essential tasks required before beginning a system conversion. It focuses on preparing the system environment, checking compatibility, and ensuring that both technical and business prerequisites are fulfilled to minimize risks during the conversion process.
Topic 4
  • Preparing for the usage of Software Update Manager: This section of the exam measures the skills of Technical Consultants and covers preparation for working with the Software Update Manager tool. It focuses on understanding SUM’s role in executing conversions, configuring its settings, and applying it effectively to achieve successful project outcomes.

 

SAP Certified Specialist - SAP S/4HANA Conversion and SAP System Upgrade Practice Tests 2026 | Pass E-S4CON-2505 with confidence!: https://drive.google.com/open?id=1quCQsUNF4DcjbsTghAwBb_p1CCj3bCpT

Online Exam Practice Tests with detailed explanations!: https://www.updatedumps.com/SAP/E-S4CON-2505-updated-exam-dumps.html