
[Jan 05, 2022] C_TS422_2020 PDF Dumps is essential on your C_TS422_2020 Exam Questions Certain Success!
C_TS422_2020 PDF Questions - Perfect Prospect To Go With C_TS422_2020 Practice Exam
SAP C_TS422_2020 Exam Description:
The "SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing" certification exam validates that the candidate possesses the fundamental and core knowledge required of the SAP S/4HANA Manufacturing consultant profile. This certification proves that the candidate has an overall understanding and inādepth technical skills to participate as a member of a project team in a mentored role.
NEW QUESTION 45
Why would you use phantom assemblies? Note: There are 3 correct answers to this question.
- A. To increase the number of planning levels
- B. To make the assignment of components easier
- C. To reduce the number of material masters
- D. Tosimplify the structure of bills of material
- E. To reduce the number of changes required in bills of material
Answer: B,D,E
NEW QUESTION 46
An issue storage location was NOT found through the work center, bill of material (BOM)item, or material master. Whatdetermines whether the storage location can be derived from the production version?
- A. MRP Profile
- B. MRP Group
- C. MRP Controller
- D. Plant Data
Answer: B
NEW QUESTION 47
What does it mean for the production planner when MRP works with infinite capacities?
- A. MRP creates capacity requirements only if the work center has sufficient capacity.
- B. MRP creates capacity requirements without checking the capacity of a work center.
- C. MRP assigns capacity requirements automatically to work center is with the earliest available capacity.
- D. MRP assigns capacity requirements automatically after the last scheduled order on a work center.
Answer: B
NEW QUESTION 48
For a production version to be valid and consistent what requirements must be fulfilled? Note: There are 3 correct answers to this question.
- A. The assigned routing must be a rate routing.
- B. The assigned routing must NOT have alternative sequences.
- C. The assigned routing and bill of materials (BOM) must be valid in the entire validity period.
- D. The lot size range must be within the lot-size range of the assigned routing.
- E. Thedeletion flag must NOT be set for the bill of materials (BOM) or the routing.
Answer: C,D,E
NEW QUESTION 49
In which data objects do you maintain the production line as the work center forrepetitive manufacturing?
Note: There are 2 correct answers to this question.
- A. Routing
- B. Repetitive manufacturing profile
- C. Production cost collector
- D. Production version
Answer: A,D
NEW QUESTION 50
What data can you maintain in the sub items of a bill of material (BOM)? Note: There are 2 correct answers to this question.
- A. Item type
- B. Quantity
- C. Installation point
- D. Scrap percentage
Answer: B,C
NEW QUESTION 51
Which of the following business processes are controlled by parameters that are dependent on production order type? Note: There are 2 correct answers to this question.
- A. Engineering change management
- B. Planning
- C. Inspection during production
- D. Implementation
Answer: B,D
NEW QUESTION 52
In your plant, MRP is activated. Which options do you have to exclude a material from the MRP run?Note:
There are 2 correct answers to this question.
- A. Use a specific MRP controller.
- B. Use a specific MRP type.
- C. Use a specific material group
- D. Use a specific material status.
Answer: A,B
NEW QUESTION 53
In the Schedule Production app, which settings can you make in the planning strategy? Note: There are 3 correct answers to this question.
- A. Scheduling control (finite/infinite)
- B. Finiteness level (0...1)
- C. Planning mode (bucket/sequence)
- D. Fixed pegging (on/off)
- E. Direction (forward/backward)
Answer: A,C,E
NEW QUESTION 54
You use planning strategy Finite Scheduling - with Reverse and want to allow scheduling in the past. How can you achieve this?
- A. Specify a negative offset time in the strategy profile.
- B. Specify a positive planning horizon in the strategy profile.
- C. Specify a negative planning horizon in the strategy profile.
- D. Specify a positive offset time in the strategy profile.
Answer: A
NEW QUESTION 55
What does forecasting in the demand planning cycle include? Note: There are 3 correct answers to this question.
- A. One-off events
- B. Market intelligence
- C. Past procurement quantities
- D. Past quotation quantities
- E. Past sales order quantities
Answer: A,B,E
NEW QUESTION 56
What is the purpose of collective orders?
- A. To combine order management of co-products and by-products with the main product
- B. To manage production orders for an entirefinished product on multiple levels
- C. To post any component withdrawals single back flush with order confirmation
- D. To post production costs ona cost collector instead of the production order
Answer: B
NEW QUESTION 57
Which materials have a negative quantity in a bill of materials or in a recipe? Note: There are 3 correct answers to this question.
- A. Bulk materials
- B. By-products
- C. Waste products
- D. Continuous flow materials
- E. Co-products
Answer: B,C,E
NEW QUESTION 58
Mode selection is one of the scheduling options available in Advanced Planning in SAP S/4HANA. When can you use mode selection?
- A. When multiple planned orders exists in one resource
- B. When multiple operations are maintained for one product
- C. When alternate resourcesare used within one operation
- D. When multiple production versions are maintained for one product
Answer: C
NEW QUESTION 59
Advanced Planning uses master data and transaction data from SAP S/4HANA In which data obje can you set the advanced planning flag? Note: There are 2 correct answers to this question.
- A. Plant
- B. Material
- C. Work center
- D. Production version
Answer: B,C
NEW QUESTION 60
How can you set up the supply source for the SAP Kanban process? Note: There are 3correct answers to this question.
- A. Using purchasing costs for automated source prioritization
- B. Using quotations for internal and external procurement
- C. Using stock transfer reservations for stock transfer
- D. Using run schedule quantities for in-house production
- E. Using purchase orders for external procurement
Answer: C,D,E
NEW QUESTION 61
Your project team decides to use a make-to-order planning strategy for a strategic material in discretemanufacturing. What is the impact of this decision? Note: There are 3 correct answers to this question.
- A. Sales order-specific planning run is required.
- B. Production orders are created with sales order reference.
- C. Storage location MRP areas are required.
- D. Net requirements calculation is sales order-specific.
- E. Sales order-specific stock is created
Answer: B,D,E
NEW QUESTION 62
When working with both cross-plant and plant-specific material statuses in the mater al master, which status has the highest priority?
- A. The most restrictive status
- B. The cross-plant status
- C. The least restrictive status
- D. The plant-specific status
Answer: A
NEW QUESTION 63
......
C_TS422_2020 Exam with Accurate SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing PDF Questions: https://www.updatedumps.com/SAP/C_TS422_2020-updated-exam-dumps.html
True SAP Exam Extraordinary Practice For the C_TS422_2020 Exam: https://drive.google.com/open?id=16-hpc-k0JKCBjAHzT5uehBtRS7ZpLBVp