MB-335 Braindumps PDF, Microsoft MB-335 Exam Cram
New 2024 MB-335 Sample Questions Reliable MB-335 Test Engine
NEW QUESTION # 10
You need to configure production control parameters for liquid cleaning solution manufacturing.
What are two possible ways to achieve this goal? Each correct answer presents a complete solution.
NOTE: Each correct selection is worth one point.
- A. Select the Block removal of approval option for the formula
- B. Select Block editing and approve the formula.
- C. Select the Block editing option only.
- D. Require an electronic signature when the formula is approved.
Answer: A,B
Explanation:
D18912E1457D5D1DDCBD40AB3BF70D5D
Reference:
https://docs.microsoft.com/en-us/dynamics365/supply-chain/production-control/formulas-versions
NEW QUESTION # 11
You need to resolve the issue for UserE.
Which configuration options should you use? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.
Answer:
Explanation:
Explanation
A screenshot of a computer Description automatically generated
NEW QUESTION # 12
You need to create the new summer limited edition bicycle in Dynamics 365 in preparation for taking orders.
Which four actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.
Answer:
Explanation:
Explanation
Graphical user interface, text, application, email Description automatically generated
Reference:
https://docs.microsoft.com/en-us/dynamics365/supply-chain/pim/dimension-based-product-configuration
NEW QUESTION # 13
You need to set up the system to calculate the overhead rates automatically for production.
Which four actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.
Answer:
Explanation:
1 - Create cost groups.
2 - Associate cost groups to items and resources.
3 - Create overhead calculation node for materials as sucharge and labor as rate for setup time.
4 - Define the basis for calculation costs as absorption.
NEW QUESTION # 14
You need to meet the needs for the large teakwood furniture order.
What must you configure? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.
Answer:
Explanation:
NEW QUESTION # 15
You use the master planning module for Dynamics 365 Supply Chain Management.
Planned production orders have been created.
Several sales orders are canceled in response to concerns about recent online reviews of a product.
You need to enable the appropriate action message.
Which action message should you enable?
- A. Increase
- B. Derived actions.
- C. Advance
- D. Postpone
- E. Decrease
Answer: E
Explanation:
The action message that you should enable is Decrease. Here is the explanation:
An action message is a system-generated suggestion to change an existing planned, approved, or firmed order. Action messages are generated by the master planning calculation in response to changed requirements1. For example, the ship date or quantity is changed on a sales order after you've already created a purchase order to fulfill the demand for that sales order. In this case, the master planning calculation generates one or more action messages that suggest that you update the purchase order. You decide whether to make the changes that are suggested.
The Decrease action message indicates that production orders, purchase orders, and other receipt transactions should be decreased to prevent excess inventory levels1. This action message is generated when there is less demand for a product than was previously planned. For example, if several sales orders are canceled, the master planning calculation will generate a Decrease action message for the corresponding planned production orders.
To enable the Decrease action message, you must select it on the Coverage groups page for the coverage group or item that you want the message to apply to1. You can also specify a decrease margin, which is the minimum percentage difference between the current quantity and the suggested quantity that will trigger a Decrease action message1.
NEW QUESTION # 16
You need to calculate estimated consumption of ingredients for liquid cleaning solution.
What is the consumption? To answer, select the appropriate option in the answer area.
NOTE: Each correct selection is worth one point.
Answer:
Explanation:
Explanation
NEW QUESTION # 17
A manufacturer is implementing Dynamics 365 Supply Chain Management to create blends of oil and industrial lubricant.
The manufacturer requires detailed documentation for the production order process before manufacturing begins for the products. The shop floor must review, approve, and anticipate all production runs. Before production starts, the manufacturer wants to ensure that the order can be completed by a certain timeframe based on capacity.
You need to define the production life cycle stages.
Which five actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.
Answer:
Explanation:
1 - Create a production order.
2 - Estimate the order.
3 - Schedule production jobs.
4 - Release the order.
NEW QUESTION # 18
A company uses Dynamics 365 Supply Cham Management.
Several production orders are in the started status.
An issue with equipment causes a rollback in the production status tor some of the orders.
Some orders must be reset once the equipment is repaired, based on which products were being manufactured.
You need to reset the production orders based on the requirements
Which status should you use for each requirement? To answer, drag the appropriate statuses to the correct requirements. Each status may be used once, more than once, or not at all.
You may need to drag the split bar between panes or scroll to view content.
Answer:
Explanation:
Explanation
A close-up of a white background Description automatically generated
NEW QUESTION # 19
Note: This question is part of a series of questions that present the same scenario. Each question in the series contains a unique solution that might meet the stated goals. Some question sets might have more than one correct solution, while others might not have a correct solution.
After you answer a question in this section, you will NOT be able to return to it. As a result, these questions will not appear in the review screen.
A manufacturing plant uses Lean processes. You plan to outsource a painting operation to a subcontracting vendor. You create a service item named SP 01 to represent the painting service.
You need to create a subcontracting activity for the painting service.
Solution:
* Create a vendor warehouse for the subcontracting vendor.
* Create a vendor resource and add it to a new work cell for outsource painting.
* Create a production flow transfer activity and specify the vendor warehouse as The target warehouse.
Does the solution meet the goal?
- A. Yes
- B. No
Answer: B
Explanation:
Explanation
The solution does not meet the goal. Here is the explanation:
To create a subcontracting activity for the painting service, you should use the following steps1:
Create a vendor warehouse for the subcontracting vendor. This step is correct, because you need to create a warehouse that is assigned to the vendor account and set it as vendor-managed1. This way, you can track the inventory that is located at the vendor's site.
Create a vendor resource and add it to a new work cell for outsource painting. This step is correct, because you need to create a resource that is assigned to the vendor account and add it to a resource group that represents the subcontracting work cell1. This way, you can assign the subcontracting activity to the vendor resource.
Create a production flow transfer activity and specify the vendor warehouse as the target warehouse. This step is incorrect, because you need to create a production flow process activity, not a transfer activity, for the subcontracting service1. A process activity represents an operation that transforms material into products or semi-finished goods2. A transfer activity represents a movement of material or products from one location to another2. You also need to specify the service item (SP 01) as the product of the process activity, and select the Generate license plate option on the mobile device menu item that is used for reporting as finished1.
NEW QUESTION # 20
An automobile manufacturer leases cars to companies for use as company cars.
A car leased to a company breaks down and requires repairs.
You must open a maintenance request and replace the car with an equivalent model until the original car is repaired and returned to the company. When the manufacture' receives and inspects the car, the replacement car can be released to the company.
You need to select the maintenance request components to use.
Which components should you use? To answer, drag the appropriate components to the correct assets. Each component may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content.
Note: Each correct selection is worth one point.
Answer:
Explanation:
Explanation
To select the maintenance request components to use, you should use the following:
The leased car that must be repaired: You should use the component. An inbound asset is an asset that is received from a customer or vendor for maintenance or repair1. You can use the Inbound assets page to create and manage inbound assets in Asset Management2. You can also create a maintenance request for an inbound asset and link it to a work order3.
The replacement car for the leased car: You should use the Outbound asset component. An outbound asset is an asset that is sent to a customer or vendor as a temporary replacement for an asset that is being maintained or repaired1. You can use the Outbound assets page to create and manage outbound assets in Asset Management. You can also link an outbound asset to an inbound asset or a work order.
1: Inbound and outbound assets 2: Inbound assets 3: Create a maintenance request for an inbound asset :
[Outbound assets]
NEW QUESTION # 21
You need to resolve the issue for UserB.
What are two possible ways to achieve this goal? Each correct answer presents a complete solution.
NOTE: Each correct selection is worth one point.
- A. Create a product master with predefined variants for ounces and boxes.
- B. Set up configuration and weight for partial visibility.
- C. Set up configuration and weight for full visibility.
- D. Create a catch weight item.
Answer: C,D
NEW QUESTION # 22
You need to create the constraint for the ML seat selection.
Which expression constraint should you use?
- A. Seat!=ML
- B. Implies[Trim==Legend,Seat==ML]
- C. Implies[Seat==ML,Trim==Legend]
- D. [Trim==Legend|Seat==ML]
Answer: C
Explanation:
Reference:
https://docs.microsoft.com/en-us/dynamics365/supply-chain/pim/expression-constraints-table-constraints-produc
NEW QUESTION # 23
You need to configure lot number control for inventory. Which option should you use?
- A. Primary socking
- B. Blank receipt allowed
- C. Physical inventory
- D. Blank issue allowed
Answer: C
NEW QUESTION # 24
Note: This question is part of a series of questions that present the same scenario. Each question in the series contains a unique solution that might meet the stated goals. Some question sets might have more than one correct solution, while others might not have a correct solution.
After you answer a question in this section, you will NOT be able to return to it. As a result, these questions will not appear in the review screen.
A manufacturing plant uses Lean processes. You plan to outsource a painting operation to a subcontracting vendor. You create a service item named SP-01 to represent the painting service.
You need to create a subcontracting activity for the painting service.
Solution:
* Create a purchase agreement for the subcontracting vendor that contains the pricing information for SP-01.
* Create a vendor resource and a work cell for outsourced painting, then add the resource to the work cell.
* Create a production flow process activity using the painting work cell and the service item as the picking activity.
* Create a service term on the activity to tie the purchase agreement to the activity.
Does the solution meet the goal?
- A. Yes
- B. No
Answer: A
Explanation:
Explanation
The solution meets the goal. Here is the explanation:
To create a subcontracting activity for the painting service, you should use the following steps1:
Create a purchase agreement for the subcontracting vendor that contains the pricing information for SP-01. This step is correct, because you need to create a purchase agreement that defines the terms and conditions for purchasing the subcontracting service from the vendor1. You also need to add a purchase agreement line for SP-01 and specify the quantity and price of the service.
Create a vendor resource and a work cell for outsourced painting, then add the resource to the work cell. This step is correct, because you need to create a resource that is assigned to the vendor account and add it to a resource group that represents the subcontracting work cell1. This way, you can assign the subcontracting activity to the vendor resource.
Create a production flow process activity using the painting work cell and the service item as the picking activity. This step is correct, because you need to create a process activity that represents the subcontracting service in the production flow1. You also need to specify the painting work cell as the resource group and SP-01 as the product of the process activity. You also need to select the Generate license plate option on the mobile device menu item that is used for reporting as finished1.
Create a service term on the activity to tie the purchase agreement to the activity. This step is correct, because you need to create a service term that links the purchase agreement line to the production flow process activity1. A service term defines how a service item is consumed in production and how it is invoiced by the vendor.
1: Activity-based subcontracting
NEW QUESTION # 25
A company uses distributed hybrid topology within their Dynamics 365 Supply Chain Management system.
The company plans to build a manufacturing plant on a mountain to be closer to a required mineral source. Internet connectivity is unreliable, and availability of bandwidth speed is limited. The company plans to deploy an operational edge scale unit for the plant to address the connectivity issue.
You need to determine where production operations can be performed.
Which method should you recommend?
To answer, drag the appropriate methods to the correct requirements. Each method may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content.
NOTE: Each correct selection is worth one point.
Answer:
Explanation:
NEW QUESTION # 26
A company plans to account for indirect costs related to materials used to manufacture products.
The items used to manufacture products have surcharge rates that depend on the type of product being used.
You need to set up the costing sheet to include surcharges for specific items.
Which three actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.
Answer:
Explanation:
Explanation
A screenshot of a list of items Description automatically generated
NEW QUESTION # 27
You need to address the ignition switch issue.
Which three actions should you perform? Each answer presents part of the solution.
NOTE: Each correct selection is worth one point.
- A. Copy link and products.
- B. Define business impact.
- C. Set product readiness to manual,
- D. Set product readiness to automatic.
- E. Change product lifecycle state.
Answer: B,C,E
Explanation:
Topic 5, Adatum CorporationAdatum Corporation is a multi-entity
corporation located in Seattle, Washington in the United States. The
company is a leading producer of specialty cakes and cookies. The
company also manufactures specialty chocolates that use ethically
sourced ingredients from around the world. The company plans to
launch a new product line of organic chocolates later this year.
Adatum plans to implement Dynamics 365 Finance and Dynamics 365 Supply Chain Management to manage financials, inventory, and manufacturing capabilities across the entire organization.
* Manufactured products are stored at the distribution warehouses until they are shipped to customers.
* Individually branded pre-packaged cake and cookie mixes are supplied to specialty cafes and restaurants.
The mixes are shipped directly to the cafes and restaurants from the production factories.
* The company maintains a fleet of trucks and also subcontracts shipments between the factories and warehouses to outside vendors.
* The mixes and specialty chocolates are based on standard recipes that use precise ingredient ratios. There are strict rules around ingredient substitutions.
* All mixes use one of three base recipes as their foundation: BaseA, BaseB. and BaseC. Additional ingredients, spices, and flavorings are then added to make the final product.
* BaseA and BaseB are made in large batches and stored until they are used in the other mixes.
* Mixes with BaseA have a shelf life of six months due to the type of flour it uses.
* Specialty chocolates are manufactured only during the holiday season.
* Specialty desserts are offered during the holiday season. This year, customers may specify additional icing colors and cake layers when placing orders. Depending on the popularity of two of the new colors, they may be offered the next year.
* Cocoa oil that is extracted during the production of some of the specialty chocolates is used in the BaseB foundation mix.
* Cleaning and setup of machinery between products has been causing delays in production.
* Prices of raw ingredients such as sugar can fluctuate greatly depending on seasonal and worldwide demand.
* To properly record profitability, ail raw materials use the first in, first out (FIFO) costing method, while finished products are recorded at standard costs.
* Large fluctuations have been occurring at month end in costs reported due to the inability to track production runs that span from month-to-month.
* Leftover flour and sugar from production runs are collected, packaged, and donated to local food banks if the amount is too small to use in other runs.
* To maintain Adatum's certification as a manufacturer of ethically sourced ingredients, the traceability of every ingredient in all products to their source must be tracked.
* All products must be randomly tested for adherence to quality standards for ingredient makeup and weight.
* Similar recipes must be able to be produced in succession to limit machinery cleaning and setup times.
* All costs must be tracked for each production run and be able to be reconciled at the end of the monthly accounting cycle, including any work in process (WIP) costs and donations.
* The organic chocolate line must be set up. The ingredients cannot be mixed with non-organic ingredients in inventory.
* Mixes are generally stored and sold in 16-ounce bags. Some quantities are sold and distributed in 5. 10. and
20-gallon containers to large restaurants.
* Each mix has a single unique item number and is tracked per batch produced.
* Specialty chocolate products must be stored in climate-controlled areas of the warehouse.
* QA TesterA discovers during a random test that the batch of a mix does not contain the necessary amount of IngredientB.
* VendorZ, who transports finished goods from PlantA to Warehouses, is consistently late picking up product.
* OperatorA must consolidate partial mix batch group runs into saleable package quantities.
* UserB must set up the mix items.
* UserC learns that mixes containing BaseA have been stamped with a batch date from the flour vendor and is not being calculated from the mix manufacturing date. The mixes from the past month that might be impacted need to be identified and the calculation needs to be corrected.
* UserD must update the costs of finished goods. Accounting wants labor calculated in WIP based on how much time an individual spends performing the operation, as well as the finished goods to post to a specific different ledger account.
* UserE must set up and maintain the cost of sugar.
* UserF must decrease downtime for the machinery.
* UserG must plan the specialty desserts for the current holiday season.
NEW QUESTION # 28
You need to meet the substitution requirements for User4 and User5.
What must you configure? To answer, drag the appropriate configurations to the correct substitution requirements. Each configuration may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content.
NOTE: Each correct selection is worth one point.
Answer:
Explanation:
NEW QUESTION # 29
You need to configure production control parameters for liquid cleaning solution manufacturing.
What are two possible ways to achieve this goal? Each correct answer presents a complete solution.
NOTE: Each correct selection is worth one point.
- A. Select the Block removal of approval option for the formula
- B. Select Block editing and approve the formula.
- C. Select the Block editing option only.
- D. Require an electronic signature when the formula is approved.
Answer: A,B
Explanation:
Reference:
https://docs.microsoft.com/en-us/dynamics365/supply-chain/production-control/formulas-versions
Topic 2, CASE STUDY 1 Manufacturing Company
General information
A manufacturing company produces custom configured-to-order motorcycles. The company plans to implement Dynamics 365 Supply Chain Management. The company contains one legal entity located in Missouri where all production and warehousing operations occur.
Customization options
The custom motorcycles have a variety of selections that can be selected in the listed order by the end customer, including the following:
Customization restrictions
The following restrictions on customizations are in place:
* Green color can only be sold with the Legend Trim.
* Orange color can be sold with the Sport or Legend Trim.
* The ML seat must be included in the Legend package.
* The MS seat must be included in the Sport package.
Manufacturing facilities
The company includes the following manufacturing groups: Assembly and Plastic Molding. The Assembly group is responsible for assembling the motorcycles with purchased and manufactured goods. The Plastic Molding group is responsible for manufacture of all plastic parts used in the assembly area.
Motorcycle manufacturing
The parts for the product assembly are picked from the warehouse and staged at the correct workstation by a warehouse operator for each production order.
Plastic manufacturing
Plastic parts are molded using dyes that create multiple parts at once. The parts are machined in the same production process to remove excess plastic and add additional holes for assembly. Excess plastic is recycled back into the feedstock of the same color plastic chips for use in the molding process.
Metal Parts
Raw metal parts are purchased fully machined but without primer or paint. The parts are subcontracted to a vendor for primer and paint based upon the color requirements.
Facility
The company has a single warehouse that supports both the assembly and plastic manufacturing areas. The warehouse consists of three aisles with 15 bins and three shelves. The facility has no Wi-Fi capacity but has hardwired terminal stations throughout the assembly production line.
Transactions are currently completed by office staff. Raw materials transfer must support capacity constraints for paint and primer.
Requirements
The company has a single warehouse that supports both the assembly and plastic manufacturing areas. The warehouse consists of three aisles with 15 bins and three shelves. The facility has no Wi-Fi capacity but has hardwired terminal stations throughout the assembly production line.
Transactions are currently completed by office staff. Raw materials transfer must support capacity constraints for paint and primer.
Sales Order
The company has the following requirements for sales orders:
* During the configuration of a sales order, invalid combinations must be prevented.
* Each configuration must create a unique bill of material (BOM) and Route based on options selected.
* Sales pricing for the sales order must be based upon options selected.
* Due to emissions regulations, the motorcycles cannot be sold to the state of California.
Motorcycle manufacturing
The company has the following requirements for motorcycle manufacturing:
* Schedule labor only at the labor pool level without machines by day
* Produce motorcycles within a scheduled day in any order.
* Record actual production labor with start/stop times.
* Record manager approval of labor entered prior to posting.
* Post actual material consumption after production is finished.
Plastic manufacture
The company has the following requirements for motorcycle manufacturing:
* Schedule both labor and machines.
* Adjust schedules by using a Gantt chart.
* Backflush standard labor by operation.
* Post actual material consumption at the start of production.
* Track and allocate costs to the excess plastic.
* Report multiple molded part numbers during the same production run.
* Determine the correct mold to use on a production order.
* Generate a batch number for each production order.
Metal Parts
The company has the following requirements for metal parts manufacturing:
* Schedule shipments to the vendor for painting.
* Receive painted parts into inventory from the vendor.
* Track vendor inventory levels.
Default
You must configure defaults for manufacturing execution production orders to meet the following requirements:
* Ensure accuracy for production order pick list posting.
* Ensure correct pick list creation.
Issues
A). In the current system, the company cannot calculate overhead rates and determine the breakdown of material, labor, machine, and overhead costs for production.
B). The company is manually calculating an 8% overhead on materials and posting a journal manually.
NEW QUESTION # 30
You need to configure the system to track the cost and delivery performance of VendorZ.
Which two actions should you perform? Each correct answer presents a complete solution.
NOTE: Each correct selection is worth one point.
- A. Add an activity to the production route for deliveries.
- B. Create a service product and set Stocked product - Yes.
- C. Add an activity to the production flow for deliveries.
- D. Create a service product and set
Answer: A,B
NEW QUESTION # 31
......
Feel Microsoft MB-335 Dumps PDF Will likely be The best Option: https://www.updatedumps.com/Microsoft/MB-335-updated-exam-dumps.html
MB-335 exam torrent Microsoft study guide: https://drive.google.com/open?id=17QLMPROjq-2sX1ZuJbyd1ypYW0w4hEhq